Feature · Complaints and risk
Registers that close the loop.
Record complaints and concerns, track them from received through to resolved and closed, and keep an audit-ready history of how each one was handled. The risk register works the same way. These are the registers the Practice Standards expect, kept properly.
14 days, every feature, no credit card.

Complaints, from received to closed
A complaint that is handled well and recorded badly still fails an audit. Accorda gives each complaint an owner and a status, and keeps the history of how it was handled, so the register shows not only that a complaint was closed but how.
- Status from received through resolved to closed
- Owner and handling history on every entry
- Timestamped and SHA-256 signed like every other record
A risk register you actually keep
The risk register uses the same pattern: raise, assign, review, close, with the history on file. Because it sits beside your incidents and complaints, the connection between a risk and the events that realised it is visible rather than reconstructed.
Guides
Plain-English answers to the questions behind this page.
Does feedback count as a complaint in aged care?
Not all feedback is a complaint, and treating it that way either overloads the record or lets a real complaint go unrecorded. Here is the practical distinction, and what changes once feedback becomes one.
Read the guideWhat is a management review, and what should your board see?
A management review is a scheduled meeting where leadership looks at how quality and safety are actually performing, using the records, and decides what to change. Here is what goes in, what comes out, and what a board should see.
Read the guideSerious incidents in childcare: what to notify, and when
What counts as a serious incident under the National Quality Framework, the 24-hour notification rule, and what a service needs on record before and after it notifies.
Read the guideWhat counts as a reportable incident under the NDIS Practice Standards?
Not every incident has to go to the NDIS Commission. Here is the plain-English version of what does, what a provider decides internally, and where the line sits.
Read the guide
FAQ
Straight answers.
Are complaints and risks kept separately?
Yes, as two registers, each tracked from raised through to closed with an owner and a handling history.
Do these go into the audit pack?
Registers are part of the records Accorda holds and can be included when you assemble evidence for an audit.
Start today
Walk into your next audit ready.
Try Accorda free for 14 days. Every feature, no credit card.